• home/
  • About/
  • projects/
  • downloads/
  • Contact Us
  • agricultural
    projects
  • industrial
    projects
  • civil
    projects
  • waste
    management
01465 821 348 or email us>

Industrial Products - Project 6


OLE base Balloch Road Renton

Client: BAM Nuttall

Project timescale: 3 weeks in September 2021

Solway Precast was awarded to make an OLE base for the railway line improvement on Balloch Road at Renton in Dumbartonshire. The project had a short turnaround of 3 weeks, the base had to be cast upside down as all faces were mould finish and with projecting bolts on the top face and a weight of 17 tonnes added to the yard team difficulties on how to turn over.



Product Pages

[ Agricultural Products ] - [ Civil Products ] - [ Industrial Products ] - [ Waste Management Products ]

  • require an estimate
  • brochure download & compliance documents
  • where we are

Solway Precast Products Ltd. Braehead, Barrhill, Girvan KA26 0QR Tel 01465 821348 Fax 01465 821383

Copyright © 2025 Solway Precast Products Limited