We have a quick and easy system to form a lift shaft, once the site required base has been cast the shaft can be installed within 1 day. The units come with integrated doorways, lift manufacturers fittings and a tested certificated roof slab with fittings. The units have a half check joint to lock together, this aids the quick installation.