We have developed a sectional sheep dipper, it consists of a first down which can include a suction recess for emptying and a slide for the sheep to enter the tank. We then have standard sections which are added to form the volume you require, finally a last down to complete the tank. We then have a ramp which goes into the last down for the sheep to exit the dipper. All joints are supplied with a sealant and then the joints require to be pointed up. Site requirement is a level strip foundation for the units to be erected on, this will support the joints and eliminated the risk of a leak.